Case Studies
Behind every project is a story worth telling.
Learn how RedBuilt helped project teams overcome challenges, reduce errors, and stay on schedule.
Taylor Middle School Cafeteria
At the beginning of the project, the team conveyed that they wanted more of an open feel since the roof system was going to be exposed. To achieve this look, they came up with a final design that consisted of double trusses at eight-foot on-center.
Solving Site Building Height Issues
Through coordination and changes in the radius of the truss, this custom home was able to meet building height requirements for the neighborhood without sacrificing the integrity of the design.